Contract Notice Sewer Construction WorkSewage Collection Transportation And Treatment Of Dionyssiou Beach Mouries Area Municipality Of Nea Propontida No 3 11 Description The Construction Of The Project Includes A Suction Drainage System Grids Valves And Other Equipment A Vs 2 Suction Pump A Drainage Pipe To The Existing Dionysiou Beach Pumping Station An Upgrade Of The Existing Dionysiou Pumping Station Operation Of Vacuum Wells And Valves And Central Control Station Finally It Also Includes The Expansion Of Existing Wastewater Treatment Plants Time Limit For Receipt Of Tenders Or Requests To Participate Date 04 11 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.