Contract Notice Construction Work For Gas Pipelines19 122 Beattock Compressor Station UpgradesDescription Contract For The Construction Of Facility Upgrades Modifications At Gni Uk Beattock Compressor Station In Scotland The Scope Will Include The Construction Installation Commissioning And Certification Of The New Temporary Bypass Tie Ins Splitting Of Suction And Discharge Headers Suction Throttling Facility And Agi Dcs Control System Integration The Works Will Require Interfaces With Existing Site Infrastructure And Equipment Such As The Suction And Discharge Headers Existing Pipework Compressor Buildings Site Electrical System Scada Ducting Drainage And Existing Civil Layout The Works Will Require Liaison Throughout The Project Duration With Various Stakeholders Particularly The Clients Operations Team And Engineers The Construction Stage Will Include 1 Pre Construction Works Including Site Investigations And Surveys Hazcon Preparation Of All Hsqe Documentation And Programming And Sequencing To Ensure Station Operation Is Maintained 2 Installation Of A Temporary Supply To Maintain Station Operations During Works 3 Installation Of Pipe Arrangement To Split Suction And Discharge Headers 4 Installation Of Suction Throttling Arrangement 5 Liaise And Assist C I Contractor For Scs Integration 6 Testing Snagging Commissioning And Site Acceptance Tests Handover To Client With Complete H S File Including All Records Residual Risk Register Full Life Cycle O M Schedule And Manuals For Further Information Please Refer To Pqq Document Time Limit For Receipt Of Tenders Or Requests To Participate Date 23 09 2019 Local Time 12 00
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.