Request for Proposals For Develop The Design And Implementation Of Visitor And Infrastructure Services

Tender Detail

21370500
57577
United Nations UN
Request for Proposals For Develop The Design And Implementation Of Visitor And Infrastructure Services
ICB
Northern Africa
Arab World,Middle East,Middle East and North Africa, MENA,African Union
28-07-2019

Work Detail

Request For Proposals Are Invited For Develop The Design And Implementation Of Visitor And Infrastructure ServicesDeadline 28 Jul 19Posted 17 Jul 19Background InformationThe Project To Strengthen Financing Systems And Manage Protected Areas In Egypt Is To Establish A Sustainable System For The Financing Of Protected Areas And The Associated Structures Systems And Administrative Capacities Required To Ensure The Effective Use Of Resources To Meet The Needs Of Biodiversity Conservation As Well As The Removal Or Significant Reduction Of A Wide Range Of Obstacles To Sustainable Financing The Project Will Provide The Ministry Of The Environments Nature Protection Sector With An Effective Set Of Tools And Means To Support Finance And Expand The Economic Exploitation Activities In Egypts Protected Area System Over The Long Term This Will Be Achieved Mainly Through Self Generated Revenues Through Successful Access To The Following Results Establish And Activate Legal Policy Regulatory And Institutional Frameworks That Facilitate The Generation And Maintenance Of Income And Other Aspects Of Financing And Sustainable Management Of Protected Areas Mobilize Adequate Financial Resources To Ensure That Egypts Protected Area System Is Managed In An Effective Manner That Takes Into Account The Conservation Of Biological Diversity Cost Effective Work Planning And Management Systems Ensure That Resources Mobilized And Managed Are Effectively Allocated And Managed The Project Aims At Helping To Manage And Protect The Natural Components Of The Reserve To Provide The Protected System With Sustainable Income To Develop Visitors Facilities And To Spread Public Awareness Of The Cultural Heritage Of The Protectorate And Egypt For The Benefit Of The Local Community ObjectivesThe Objectives Of These Constructions And Civil Works Are To Develop The Design And Implementation Of Visitor And Infrastructure Services At Abu Jalum Reservoir In South Sinai According To The Scope Of Work In Annex 1 Of The Draft Terms Of Reference Design And Proposed Models Of Project Elements In Annex 2 Activities To Implement The Development Of The Protected Area According To The Scope Of The Project The Qualified Contracting Company Must Understand The Challenges Of Durability And Maintenance In Nature Reserves The Qualified Contracting Company Should Use Local Expertise And Employment Wherever Possible As Well As The Use Of Local And Environmental Building Materials The Work Schedule Should Be In Line With The Approved Technical Specifications Of The Project The Scale Of The Projects Pilot Works And The Accompanying Technical Guidelines The Egyptian Code Of Construction Works The Industrial Assets And The Instructions Of The Supervisory Authority The Engineering Unit Of The Project Of Strengthening The Finance Systems And Managing The Protected Areas Of The Terms Of Reference The Company Should Provide A 4Wd Vehicle To Visit The SiteVisit The Site And Submit Technical Inquiries Within One Week From The Date Of Announcing The Process The Company Must Wishing To Participate In The Process To Provide Technical And Financial Offers Send An Email That The Desire To Provide The Tender The Expression Of Interest On The Electronic Highest Titles Before Visiting The Site In Order To Coordinate To Determine The Date With The Engineering Unit Project And Mr Director Protected Use Local Employment And Equipment Wherever Possible Inspection Of The Required Works Within The Scope Of The Project Is A Negative Review Of The Ignorance In The Case Of New Items Not Mentioned In The Attached Bill Of Quantities And The Company Is Required To Implement Them In Accordance With Its Specialized Technical Vision They Shall Be Written In The Technical Offer And Priced In The Financial Offer As Optional Items Not Covered By The Basic Financial Offer Ensure That The Natural And Environmental Integrity Of The Site Is Maintained And That The Site Is Restored To Its Original Status After Completion Of The Work Review And Follow The Local Laws And Regulations And The Global Experience In The Field Of Construction In Natural Reserves While Adhering To The International Guidelines For Achieving The Objectives Of These Constructions And Civil Works Guidelines For Sustainable Tourism In Iucn Reserves 2002 Chapter 5 Infrastructure And Services Development Link Https Portals Iucn Org Library Node 8024Obtain All Necessary And Necessary Permits From The Local Authorities And All Concerned Parties Commitment To The Projects Indicative Work Statement Attached To The Processs Terms Of Reference Compliance With Procurement Rules Issued By The United Nations Development Program Modification Orders Unexpected Needs May Arise During The Project It Is Expected That The Provider The Implementing Company Will Supply The Additional Materials After Obtaining Competitively Priced Written Bids If Necessary To Meet Undp Procurement Rules And Supervise The Installation Notification Undp Project Manager For Strengthening Funding Systems And Management Of Protected Areas Immediately With Any Actual Or Anticipated Problems Related To The Approved Schedule Of Project Implementation Taking Full Responsibility For The Study Of The Requirements And Specifications And The Quantities Of The Project Before The Delivery Of Offers Taking Into Account All Factors In The Technical And Financial Offer Commitment To Pay All Costs And Expenses Of Supervision Required For All Stages Of The Work Of The Project To The Relevant Authorities If Any Commitment To The Adoption Of All Technical Submissions From An Approved Consultant From The Supervising Authority Of The Project Specializing In The Work Within The Scope Of The Project Before Submitting It For Approval By The Engineering Unit Of The Project Commitment To Submit An Environmental Impact Assessment Eia Study For Project Work And Submit It For Accreditation Before Implementation Begins As Built In Accordance With The Instructions Of The Engineering Unit In The Project Of Strengthening The Financing Systems And Management Of Natural Reserves And Submitting Them Upon Delivery Of The Project To Be Delivered To The Beneficiary Eeaa Execution Of All Works According To The Egyptian Code The Technical Specifications And The Approved Quantities Of The Project The Accompanying Design Drawings And Their Notes The Instructions Of The Supervisory Body And The Assets Of The Industry Execution By The Executing Company In Constant Coordination With The Management Of The Reserve And The General Administration Of Sinai Reserves Before Starting Any Work Note The Work Will Be Measured According To The Approved Technical Drawings For Inquiries By Sending An Email To Engineer Mohamed Fathy Project Manager Mohfathy227 Gmail ComEngineer Ahmed Talaat Technical Officer Engineering Unit Atalaat383 Gmail ComEngineer Abdulrahman Al Taliawi Technical Officer Engineering Unit Aeltaliawi Gmail Com Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail