Tenders Are Invited For Eta Bita Process Water Treatment Plant Etap

Tender Detail

20318312
Self Funded
Tenders Are Invited For Eta Bita Process Water Treatment Plant Etap
ICB
Southern Africa
African Union,United Kingdom
26-05-2019

Work Detail

Tenders Are Invited For Eta Bita Process Water Treatment Plant Etap Government Of Angola Through The Ministry Of Energy And Water Requested A Financing GuaranteeFrom The World Bank To Implement The 4 Bita System To Be Implemented From 2020 For A Period Of 3 Years The Development Objective Of The Bita Project Is ToIncrease Water Production By Supplying The CurrentTry To The Capital City And Raise The Rates Of Coverage Of Water Supply To The Southeast Sule Zones Of TheCity Of Luanda Implementation Of Distribution Networks And Home Connections Associated To The Bita DistributionCenter In The Zone Of Influence Of The Construction Project Of The Distribution Center Of Bita Cd Composed Of Reservoirs Elevated Tank Including The Pumping Station Auxiliary Buildings And NetworksOf Associated Distribution Lot B3 Of System 4 Formerly Denominated Lot B8 Implementation OfDistribution Networks And Household Links Associated To The Bita Distribution Center In The Zone OfInfluence Of The Construction Project Of The Distribution Center Of Cd Zona Verde Cabolombo Lot B4 Composed Of Reservoirs Elevated Tank Including Pumping Station Auxiliary Buildings And AssociatedDistribution Networks Lot B4 Of System 4 Formerly Referred To As Lot B9 Implementation Of Distribution Networks And Household Links Associated To The Bita DistributionCenter In The Zone Of Influence Of The Construction Project Of The Distribution Center Of Cd Ramiros Composed Of Reservoirs Elevated Tank Including The Pumping Station Auxiliary Buildings And NetworksOf Associated Distribution Lot B5 Of System 4 Previously Denominated Lot B10 Implementation OfDistribution Networks And Home Connections Associated To The Bita Distribution Center In The Zone OfInfluence Of The Construction Project Of The Distribution Center Of World Cd Consisting Of Reservoirs Elevated Tank Including The Pumping Station Auxiliary Buildings And Networks Of Associated Distribution Lot B6 Of System 4 Formerly Denominated Lot B11 Improvement Of The Distribution Networks In TheCamama Zones Associated To The Project Of Implantation Of Pipelines Eta Bita Cd Camama CdCamama Cd Cabolombo Cd Cabolombo Cd Rami Cd Ramiros Cd Ilha Do Mussulo Cazanga Of Lot B2 Of System 4 Previously Denominated Lot B12 Improvement Of The Distribution Networks In The Areas Of Benfica Il Associated To The Project OfImplantation Of Pipelines Eta Bita Cd Camama Cd Camama Cd Cabolombo Cd Cabolombo CdRami Ros Cd Ramiros Cd Ilha Do Mussulo Cazanga Do Lote B2 Of System 4 Formerly DenominatedBatch B13 Responsibility For The Implementation Of The 4 Bita System Construction Project Is From The Ministry OfEnergy And Water Epal Ep Public Water Company Which Will Be In Coordination With OtherGovernment Agencies Involved In The Implementation Of The Project B1 B2 B3 And B7 Are Expected ToBenefit From Co Guarantee Or Co Financing By Bpl France Environmental And Social Safeguard Policies Of The World BankIn Accordance With World Bank Procedures For Issuing The Project Finance Guarantee FourEnvironmental And Social Safeguards Policies Were Implemented To Ensure That The Project In Question IsEnvironmentally And Socially Sustainable These Policies Focus On Environmental Assessment Op 4 01 Natural Habitat Op B 4 04 Involuntary Resettlement Op Bp4 12 And Physical Cultural Resources Op Bp4 11 For This Purpose Safeguards Documents Were Established To Establish Procedures To BeFollowed By The Implementers Of The Subprojects Linked To The Construction Of The 4 Bita System Namely Social Environmental Impact Study Eias And Resettlement Policy Framework Qpr Environmental And Social Impact Study Op 4 01 Potential Environmental And Social Impacts And TheRespective Mitigation Measures For The Different Types Of Investments That Are Envisaged In TheImplementation Of The 4 Bita System Construction Project The Esia Establishes Procedures To EnsureThat All Activities That Are Funded Are Subject To An Environmental And Social Assessment Process AndThat Measures Are Taken To Mitigate Potential Negative Impacts In Compliance With World Bank Op 4 01On Environmental Assessment Policy Framework Op 4 12 The Project Is Expected To Result In The Loss Of Access Temporary OrPermanent To Natural Resources Loss Of Land Due To The Construction Of Infrastructure Or Extension OfAgricultural Areas The Resettlement Policy Framework Rbm Provides Guidelines For Managing TheSocio Economic Impacts Associated With Land Acquisition By The Project And For The Protection OfCommunities This Summary Presents A Summary Of The Content Of Documents That Are Being Published Publically ForThe Consultation Of All Interested Persons The Documents Can Be Sent By Simply Requesting Through The E Mail Address Projectbitagdepal Co Ao The Documents Can Also Be Consulted Or Downloaded On TheWeb Page Of The Public Water Company Epal Ep Www Epal Co Ao Projects They Can Also Be Found ForConsultation At The Epal Ep Directorate In Talatona Via G3ag18143 Luanda Angola Phone 226 431 567 Luanda On May 16 2019 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail