Tenders Are Invited For Environmental Impact Assessment For Construction

Tender Detail

20295348
2019 S 097 236120
Self Funded
Tenders Are Invited For Environmental Impact Assessment For Construction
ICB
Western Europe
Balkans,European Union
19-06-2019

Work Detail

Contract Notice Environmental Impact Assessment For ConstructionEnvironmental And Social Impact Assessment Esia And Permitting Support Services For The Offshore Sections Of The Eastmed Pipeline Project Eastmed Description Services To Be Performed Concern The Following Offshore Sections From An Eastern Mediterranean Gas Source To Cyprus Landfall Included Landfall Lf1 Vassiliko Industrial Area Cyprus Length Approximately 290 Km Maximum Water Depth 2330 M Max Gradient 13OCyprus To Crete Landfall Included Length 732 Km Maximum Water Depth 3000 M Max Gradient 27OCrete To South Peloponnese Landfall Included Length 421 Km Maximum Water Depth 1370 M Max Gradient 26OThe Compressor Station In Cyprus Vassiliko As Well As The Two Small Onshore Sections From The Landfalls To This Compressor Station Are Also Included The Services Include Among Others The Following Activities For The Sections Mentioned Above Preparation Of An Esia Study In Accordance With The National And European Legislation And The Ebrd Requirements Its Structure Will Follow The Provisions Of The National Legislations And Special Attention Shall Be Given To The Appropriate Assessments Regarding Protected Areas Support To The Project Owner During The Consultation Of The Esia Till The Issuance Of The Environmental Terms Approval Eta Decision Preparation Of The Application Files And Of All Necessary Documents Required In Each Country Related To Grant Of Shoreline Coastline And Sea Bottom Permits And Authorizations Procedures In Relation To The Installation Of The Offshore Pipeline Sections As Well As Any Required Support Till Their Issuance The Contractor Will Provide Mainly The Following Deliverables 1 For Cyprus A Complete Esia Study For The Sections Of The Eastmed Pipeline Within The Jurisdiction Of Cyprus I E At The Following Areas Between Eastern Mediterranean Gas Source To Cyprus Landfall And Between Cyprus And Crete The Esia Study Will Also Include The Compressor Station In Vassiliko And The 2 Small Onshore Sections Between The Landfalls In Cyprus And The Compressor Station In Vassiliko 2 For Israel A Complete Esia For The Offshore Section Within Israeli Jurisdiction I E From The Platform Next To The Sources Till The Borders Of The Eez Set Between Within Cyprus And Israel 3 For Greece A Complete Esia For The Offshore Sections Within Greek Jurisdiction I E At The Following Areas Between Crete And South Peloponnese Between Cyprus And Crete Each Esia Shall Follow The Structure Requested By The National Legislations And They Shall Be In Accordance With The National And European Legislation And The Ebrd Requirements Time Limit For Receipt Of Tenders Or Requests To Participate Date 19 06 2019

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail