Contract Notice Construction Work For Water And Sewage PipelinesRehabilitation Of Distribution Networks And Transport Of Drinking Water Str Bridge SibiuDescription The Following Specifications Are Provided In The Specifications And The Technical Project Related To The Present Contract Water Supply Dn 315 Mm Transport Network L 1 235 M Dn 160 Mm Side Street Links L 13 M Dn 110 Mm Distribution Network L 1 536 M Dn 90 Mm Hydrants L 80 M Dn 63 Mm Lateral Standing Networks L 120 M Total Network L 2 984 M New Bathtubs From Concrete Tubes Dn 1 000 Mm 1 Piece Dn 1 500 Mm 9 Pieces Fire Hydrants Underground Dn 80 Mm 16 Pcs On The Dn 110 Mm Network All Clarification Requests Will Only Be Sent To The Sicap Signed With The Extended Electronic Signature Number Of Days Until Which Clarifications May Be Requested Before The Closing Date For Submission Of Tenders Applications 20 The Contracting Entity Will Send The Consolidated Answer To Clarifications 10 Days Before The Deadline For Submitting Bids Time Limit For Receipt Of Tenders Or Requests To Participate Date 25 02 2019 Local Time 15 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.