Manual Digging Of Soil In Sloped Trenches Up To 2 M Deep Without Fasteners, Soil Group: 3, Construction Of Foundations: Concrete (B15), Installation Of Anchor Bolts: Up To 1 M In Length By Placing And Tightening In Ready-Made Sockets, Installation Of Steel, Intermediate, Free-Standing, Single-Post Supports, Mass: Up To 2 T, Installation Of Chandeliers: Incandescent, Pole Lights For Street And Road Lighting With Magnifying Lights Waterproof 150W 3000K 85-265V Ip65, Laying Kapron Pipes Under The Ground For The Protection Of A Cable, Diameter: 50 Mm, Polyethylene Water And Gas Pipe With High Flexibility, Wide Pressure Range: Diameter 50 Mm, Wall Thickness 3 Mm, Pe 100, Pn 10, Pulling Of The First Single-Core Or Multi-Core Wires In The Common Braid To Laid Pipes, Total Cross-Section, Mm2, Up To: 2.5, 1.0 Kv Power Cable 2X16, 0.66 Kv Power Cable 2X4, Manual Filling Of Ditches, Pits And Pits, Soil Group: 2, Painting Of Metal Surfaces With Oil Paint: For Large Surfaces (Except Roofing), The Number Of Painting Is 2 Times, Construction Of Foundation-Posts: Concrete