|
Engineering Design Services For The Construction Of Civil Engineering Works – Preparation Of Water Law Reports Along With Water Management Instructions For Damming Facilities From The Area Of The Catchment Management Board In Ciechanów. Preparation Of Water Law Reports Together With Water Management Instructions For Damming Facilities Located On The Sona River At Km 13+684, 15+493, 18+946, 22+685, 28+960 In The Area Of The Water Supervision In Ciechanów.,Preparation Of Water Law Reports Together With Water Management Instructions For Damming Facilities Located On The Płonka River At Km 8+258, 10+924, 19+539 In The Area Of The Water Supervision In Płońsk.,Preparation Of Water Law Reports Together With Water Management Instructions For Damming Facilities Located On The Potok Zadębie River At Km 3+173, 3+933, 5+428, 6+716 In The Area Of The Water Supervision In Płońsk.,Preparation Of Water Law Reports Together With Water Management Instructions For Damming Facilities Located On The Raciążnica River At Km 37+905, 39+097, 40+410, 41+246 In The Area Of The Water Supervision In Płońsk.,Preparation Of Water Law Reports Together With Water Management Instructions For Damming Facilities Located On The Żurawianka Główna River At Km 0+848, 2+627, 4+955, 6+994, 7+604 In The Area Of The Water Supervision In Płońsk.,Preparation Of Water Law Reports Together With Water Management Instructions For Damming Facilities Located On The Pierławka River At Km 7+399, 8+769, 10+311, 10+831, 10+968 In The Area Of The Water Supervision In Działdowo.
|