Salmon River Dike Upgrades . Part A - Salmon River Dike Upgrades Raising Of The Existing 600M-Long Earth Dike By Approximately 0.9 Meters On Average Installation Of A Concrete And Steel Barrier System Through The Pump House Section Of The Dike Tie Ins To The Existing River Side Trail Network And Maintenance Access Driveways Installation Of New Golf Ball Protection Fence (16-Feet Tall) Along The New Trail At Top Of Dike Cut And Off-Site Removal Of Approx. 60 Trees (Diameter ≫ 300Mm) Along The Dike Alignment Other Miscellaneous And Incidental Work Part B & C – Bedford Channel Bank Erosion Mitigation Installation Of A Natural Erosion Protection System At Two Sites, Wp2 (Part B) & Wp6 (Part C – Optional Work) Along The Riverbank Adjacent To The Dike Upgrade Work Installation Of Rock Armouring, Large Woody Material (Lwm), And Geotextile/Soil‑Wrap Systems To Repair The Eroding Riverbank Vegetative Restoration Measures Including Live Staking At Maximum 0.6M Spacing
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.