Overhead Line Construction – Construction Of 110 Kv Double Line Az Hasling Uw Yspertal. Construction Of An Approx. 13.5 Km Long 110 Kv Lattice Mast Double Line Between The Hasling Branch Mast And The Planned Yspertal Substation With A Total Of 48 Support Points. Construction Of A New Branch Mast In The Existing Uw-Erlauf – Uw Am Schuß Line. Manufacture Of Portal Clamping Systems For 5 Line Systems And 3 Ground Cables In Stockerau In Summer 2026 Manufacture Of Temporary Pipes At Uw Stratzdorf In Autumn 2026 Ropes, Fittings And Grounding Material Are Provided By The Client, Lattice Masts Are Included In The Contractors Scope Of Delivery.