|
bids are invited for supply, installation, commissioning, training & prove out of automatic fire detection & informer system and suppression system at the following locations of hal engine division, bangalorelocation-1: stores-e29, e34, e48, e55. location-2: stores- e30, e64.location-3: stores-e40, e43location-4: dr room (it server room), adour mk 871 final assembly. (automatic detection & firesuppression system) total quantity : a location-1: stores-e29, e34, e48, e55 engine division, hal, bangalore sl. no. description 1 supply of 4 zone conventional panel with battery backup 2 supply of conventional multi sensor (smoke + heat) detectors 3 supply of conventional manual call point 4 supply of conventional hooter cum flasher 5 supply of 2 x 1.5 sq.mm armoured copper cable frls red colour as per is standards. 6 supply of 25mm dia casing and capping. 7 installation and commissioning 8 any other itmes required for completing the job may also be quoted. (the quantity and purposemay be indicated clearly.) b location-2: stores- e30, e64 engine division, hal, bangalore 1 supply of 4 zone conventional panel with battery backup 2 supply of conventional multi sensor (smoke + heat) detectors 3 supply of conventional manual call point technical specification for installation of automatic fire detection & informer system sn description 4 supply of conventional hooter cum flasher 5 supply of 2 x 1.5 sq.mm armoured copper cable frls red colour as per is standards, 6 supply of 25mm dia casing and capping. 7 installation and commissioning 8 any other items required for completing the job may also be quoted. (the quantity and purposemay be indicated clearly.) c location-3: e40, e43 engine division, hal, bangalore 1 supply of 4 zone conventional panel with battery backup 2 supply of conventional multi sensor (smoke + heat) detectors 3 supply of beam type smoke detectors 4 supply of conventional manual call point 5 supply of conventional hooter cum flasher 6 supply of 2 x 1.5 sq.mm armoured copper cable frls red colour as per is 7 supply of 25mm dia casing & capping. 8 installation and commissioning charges 9 any other items required for completing the job may also be quoted. (the quantity and purposemay be indicated clearly.) technical specification of clean agent fire suppression system for “dr room” of engine division d location-4: dr room (it server room), adour mk 871 final assembly, engine division, hal, bangalore 1 supply of 80 litters water capacity seamless cylinder with valve for filling clean agent gas with ccoe/peso approval 2 clean agent gas 1,1,1,2,2,4,5,5,5-nonafluoro-4-(trifluoromethyl)3-pentanone. 3 master cylinder accessories: electric control head, 24 v dcdischarge hose, 2 x 31 4 discharge nozzles 5 schedule 80 seamless pipe & manifold with necessary fitting, supports etc., 6 cylinder low gas alert monitoring system electronic display type with load cell and on & off switchfacility each unit. (bottom flat type unit. 7 control panel lcd touch screen for low gas alert monitoring system. 8 12 volts dc smps power supply 5 amps and board designed especially for cylinder monitoring system. 9 supply & installation of 2 zone conventional microprocessor based fire alarm control panel with auto gasrelease module and battery backup. 10 conventional type multi-sensor smoke detectors 11 electronic hooters cum flasher 12 2 x 1.5 sqmm. armoured copper cable 13 gas abort switch 14 manual gas release switch. 15 auto dialer system with minimum 05 telephone numbers connectivity. (provision of p&t dedicatedtelephone line will be under hal scope.) 16 ms stand for mounting clean agent cylinder and accessories for low gas alert monitoring system withms mesh covering for all sides 17 warning board 18 installation, testing & commissioning 19 any other items required for completing the job may also be quoted. (the quantity and purposemay be indicated clearly.)
|