Tender Details |
|
| BRR | 8666777 |
| Tendering Authority | Irrigation Department |
| Tender No | 3646/IDMBD/Etender/2025 Dt 16.10.2025 |
| Tender ID | 2025_UPIDC_1086963_18 |
| Tender Brief | tender for repairing of damaged lining from km. 6.910 to km. 6.941 on lb of rgfc - level including lift upto 1.50 m & lead upto 300 mincluding all cost of labour, material, t&p etc complete 2 dismantaling c.c. work 3 earth work excavation in cutting/lip cuttingincluding lift upto 4 m & lead upto 30 m 4 ordinary centering andshuttering for rcc/cc work i/c all labour,t&p etc complete 5 anticorr |
| City | moradabad |
| State | Uttar Pradesh |
| Tender Value | 6.44 Lakhs |
| Due Date | 06-11-2025 |
Work Detail |
|
tender for repairing of damaged lining from km. 6.910 to km. 6.941 on lb of rgfc - level including lift upto 1.50 m & lead upto 300 mincluding all cost of labour, material, t&p etc complete 2 dismantaling c.c. work 3 earth work excavation in cutting/lip cuttingincluding lift upto 4 m & lead upto 30 m 4 ordinary centering andshuttering for rcc/cc work i/c all labour,t&p etc complete 5 anticorrosive/bitumin painting in two coats on top of sleeper including cost of all material, labour and t&p etc. 6 supplying & laying l.d.p.e. film 100 micron including cost of all material, labour and t&p etc. 7 supplying & fixing 10 mm thick thermo coal sheet in expansion joints including cost of all material, labour and t&p etc 8 supplying & laying water stop pvc ncl or nct type seal 9 laying p.c.c. 1:4:8 with stone ballast includingall cost of material, labour, t&p etc complete but excluding centering & shuttering 10 laying c.c. 1:2:4 with stone ballast includingall cost of material, labour, t&p etc complete but excluding centering & shuttering 11 ist class brick work in 1:4 c.m. all cost of material, labour, t&p etc complete 12 supplying and laying c.c tiles lining in single layer on slope in 1:3 c.m. laid on 10mm thick mortar in 1:3 over 100 mm thick c.c. in1:2:4 including allcost of matrial labour t&p required 13 construction of porous concrete window including allcost of matrial labour t&p required. 14 supplying and filling 10 mm wide expansion joints with bituminous filler. 15 ist class brick work 230 mm thick in 1:4 c.m. all cost of material, labour, t&p etc complete 16 12.50 mm thick plaster 1:4 c.m. i/c all cost of labour, material t&p etc complete |
Tender Result Details |
||||
| Bidder List |
|
|||
| Contract Date | 01-12-2025 | |||
| Contract Value | 4.81 Lakhs | |||
| Contractor Name | v k contractor | |||
Information Source |
|
| https://etender.up.nic.in | |
View Original Notice/Document |
|