|
tender for cleaning of drainage up to silt at site with disposal of 60mtr. including waste making diversion etc....all completion , dismentaling of old damaged b.o.e soling and stacking of dismantledbricks at site required for proper completion of the work as per directed by engineer incharge within distance of 60mtr etc.... all completion (non schedule item-01) , dismantling of old damaged boundary wall including stacking of serviceable material and disposal of unserviceable material with in lead of 60 meaters. as per direction of engineer-in-charge....all completion as per s.i no- 692 , earth work in excavation in foundation in ordinary soil i/c lift 1.50 & lead 30 mtr without royality etc.... all completion as per s.i no- 251 , e/w in cutting or embankment in ordinary soil including1.5mtr lift and 30mtr lead including cortage of earth from 5 km as per s.i no 253 (excluding royality) , providing and laying cement, concreate with 1:6:12 (1 cement, 6 fine sand, 12 brick ballast 40mm nominal size etc.....all completion as per p.w.d schedule no. 273 , first class brick work with 1:4 cement and coarse sand mortar etc. all complete as per pwd schedule item no. 305 , 12mm thick plaster with cement & fine sand mortor in 1:4 including supply of all material, labour etc. all complete as per pwd schedule item no. 584(i) , supply and providing of 125 micron plastic sheet etc.....all completion as per s.i no- 19 , supply laying &consolidation of 22.4-53mm gauge stone ballast and screening material by hand rammer....all completion , providing and laying in cement, concrete 4:2:1 with 20mm stone aggregate coarse sand and cement etc. all complete as per pwd schedule item no. 279(i) , 25mm thick compacted bed of fine sand compacting and proper embedding/laying of intering tiles leveling and dressing of surface , reinforced cement concrete work with cement approved coarse sand and 2cm.(3/4) gauge approved stone ballast in proportion of 1:2:4 for slab works etc. all complete as per pwd schedule item no. 284 , mild steel or iron work such as reinforced cement concrete i/e bending for proper shape and i/e supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and i/e cost of binding wire etc. all complete as per pwd schedule item no. 504. , supply/fixing of granite stone indication board in brick masonary padastal etc....all work completion as per direction of e/i/c , deduct cost of old brick bats obtained from dismenteling.....all complete. , deduct cost of old brick bats obtained from dismenteling.....all complete. , add g.s.t @ 18%
|