Iron sector projects by Neo Metaliks Limited in Burdwan

Project Information

8075
Neo Metaliks Limited
M/S Neo Metaliks Limited Is Operating A Mini Blast Furnace (MBF) Of 215 M3 Capacity. The Blast Furnace Produces 1,88,000 Tons Pig Iron Annually (TPA). The Blast Furnace Gas Is Used To Produce 4.5 MW Power, Which Is Used As Captive Power. The Volume Of Existing Blast Furnace Is 215 M3 . The Existing Production Capacity Is 1,88,000 TPA. It Has Been Observed From The Existing BF As Well As Similar BF Technology Installed At Other Plants In India That Through Appropriate Process Optimization The Production Capacity Could Be Increased By 19% To 2,24,000 TPA. This Could Be Achieved By Increasing The Sinter Burden In BF, Thereby Reducing The Coke And Flux Addition And Using Hot Blast Of 1030oc. The Extra Volume Available In BF Could Increase Productivity Of Hot Metal.
Project Value
INR 82.15 Crore /-
Planning
Burdwan
West Bengal
India
Iron
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail