Menu
    

View latest Smart Meter Tenders in India

Search all local Tender for Smart Meter. Download Smart Meter Tender Documents. Till date resultModel.Count Smart Meter tenders are published by various Tendering Authorities & Private companies. 6 live Tender Notices for Smart Meter are available in Smart Meter Tender section. Filter tenders to view Smart Meter Tenders in Maharashtra, Gujarat, Delhi etc.

Search Result
Tender 1 - 10 of 41 from India
Sort By:
Closing Date
Dec122016

TDR: 11128738
Location: Andhra Pradesh - India
Tender Value: Ref. Document

Single Phase 2 Wire Bi-Directional Smart Prepaid Energy Meter With Remote Reading, In Built Plc Modem, 240Volts, 10-60 Amps Class-I Accuracy With 800 Impulses, As Per Is:13779-1999 With Five Years Warranty As Per Specification. Technical Specification:1.Standard Applicable:Is13779:1999.2 .Type Of Meter Model No:1Phase 2 Wire Bidirectional Smart Meter With Remote Reading Inbuilt Plc Modem,Remote Disconnection And Reconnection.3 .Rating:240V, 10-60A . I .Accuracy Class:Class-I. Ii .Rated Voltge:240V 20 Percent -20 Percent . Iii .Rated Current:Ib-10 Amp Imax-60 Amp. Iv .Rated Frequency: 50Hz Or - 5 Percent . V .Power Factor: 0 Lag To Unity To 0 Lead. Vi .Minium Saturation Current: 10Amps. 4 .Maxm.Continuous Current Rating Amp :60Amps. A .Current Circuit At Rated Current: And Lt 0.2Va. B .Voltage Circuit At Rated Current: And Lt 1.5W 10Va 5 .Output Display:Lcd. 6 .On Scroll Mode And Auto Display Mode:Both Required As Per Sequence Mentioned. 7 .Reding On Power Off Condition:Meter Shall Be Able To Display Reding During Power Outage Through The Push Button Provided On The Meter With Facility For Hands Free Meter Reding With Auto-Off Provisions. 8 .Load Limitaton:Feature Should Be Available For Voltage V ,Current I ,Power Factor Pf ,Frequency F ,Power Kw And Should Be Configured Online. 9 .Under Frequency: Frequency Thresholds Can Be Should Be Set And Monitored Remotely.10 .Pre-Payment:Meter Shall Be Having The Facility With Pre-Pay And Postpaid Both Feature Vice-Versa:This Feature Should Be Configurable From Remote End.11 .Energy Losses:Automatic Energy Losses Mesurement On Lt Side.12 .Tariff:Tariff Changes Should Be Able To Change From Remote End.13 .Gaurantee Period Of Meter:5-Year From The Date Of Supply.Guarantee Period Shall Be Printed On The Nameplate. Live


Closing Date
Dec292016

TDR: 11101641
Location: Karnataka - India
Tender Value: Ref. Document

Supply Of Smart Metering System For City Gas Distribution Project Live


Closing Date
Nov292016

TDR: 11063603
Location: Delhi - India
Tender Value: Ref. Document

Supply Of 1-Phase And 3- Phase Smart Meters -Corrigendum Close


Closing Date
Dec192016

TDR: 11040200
Location: Andhra Pradesh - India
Tender Value: Ref. Document

Supply, Installation Of Smart Meters ( Single Phase &Amp; Three Phase ) With Fms For 5 Years Under Ipds Scheme Live


Closing Date
Nov222016

TDR: 11007183
Location: Delhi - India
Tender Value: Ref. Document

Tender For Supply Of 1 -Phase And 3-Phase Smart Meters - Corrigendum Close


Closing Date
Dec292016

TDR: 11003729
Location: Andhra Pradesh - India
Tender Value: Ref. Document

Supply Of Smart Metering System For City Live


Closing Date
Dec302016

TDR: 11002779
Location: Telangana - India
Tender Value: Ref. Document

Supply Of Smart Metering System Live


Closing Date
Dec302016

TDR: 10999899
Location: Andhra Pradesh - India
Tender Value: Ref. Document

Supply Of Smart Metering System For City Gas Distribution Project Live


Closing Date
Oct182016

TDR: 10743933
Location: Andhra Pradesh - India
Tender Value: Ref. Document

Procurement Of Prepaid And Smart Meters Close



Sample Tenders